West 9th Ave Extension & Overpass Construction | City of Belton

Belton, TX

Project Description: For many years, this roadway project has been identified on Belton’s Thoroughfare Plan as a high priority due to the need for an east/west connection between Main Street and Loop 121. However, due to funding constraints, the project was not feasible. In Spring 2014, the City of Belton received grant funds from the Texas Department of Transportation and the Federal Highway Administration (FHA), which allowed for the project’s design and construction. The City of Belton initiated the project by contracting with KPA for the preliminary and final design of the project. The project consists of 3,000 linear feet of roadway, a 420-foot bridge (47 feet wide) spanning Nolan Creek with lookout decks, 6-foot sidewalks, 5-food bike lane, Type C 411 pedestrian railing, and accent lighting.

KPA completed the final design, including managing structural and electrical engineering sub-consultants. KPA provided coordination with TxDOT and FHA throughout the design and bidding phase.

Scope of Services: Preliminary Schematic, Final Design (Plans and Specifications), coordination with TxDOT, FHA and TLDR, Surveying, Geotechnical, Environmental and Archeological clearances, Opinion of Probable Cost, Bidding, Review of Bids, Recommendation to Award Contract, and On-Site Representation and Construction Administration.

Construction Cost: $4,151,821