Dove Creek Drainage Drainage Improvements
Round Rock, TX
Project Description: The Dove Creek Drainage Improvements Project provided enhanced street runoff collection and conveyance to a downstream receiving waterway. The project consisted of 1,045 linear feet of polypropylene pipe, Curb Inlets, Concrete Junction Boxes, and 82 tons of Hot Mix Asphalt Concrete pavement. Additionally included in the project were 60 square yards of concrete sidewalk, 25 linear feet of concrete curb and gutter, 40 square yards of deep rock riprap, block sodding, 400 linear feet of silt fence, and 25 linear feet of rock berm. This project also consisted of adjusting the existing water and wastewater services and other miscellaneous construction activities.
Scope of Services: Preliminary Planning, Design and Construction Surveys, Dry Utility Communication, Final Design, and Construction Administration.