Doshier Farm Wastewater Treatment Plant Influent Screw Pump Replacements
Temple, TX
Project Description: The Doshier Farm Wastewater Treatment Plant (WWTP) project consisted of removing and replacing two 66-Inch diameter screw pumps. This project also included the replacement of the motors, drives, and gearboxes that were corroded due to over 14 years of exposure to hydrogen sulfide gas emissions. The final design also includes electrical upgrades.
Scope of Services: Final design, Technical Specifications, Bidding, Construction Administration, and On-Site Representation. KPA services also included coordination with an elected sub-consultant.
Construction Cost: $800,000