Completion of Georgetown’s San Gabriel Lift Station
Georgetown, TX
Georgetown’s San Gabriel Lift Station is complete! The new standalone submersible lift station replaced the existing Park Lift Station, which had deteriorated pumps, piping, and metal supports within the station’s wet well area. The project also included a new 20-inch force main extension connecting the existing force main and a chopper/aerator pump in the current wet well upstream of the recent wet well to mitigate clogging and reduce odor emissions. The pumps at San Gabriel Lift Station are submersible, located in the water of the wet well, similar to a sump pump in a home.