Project Description: The Winner’s Circle Culvert Replacement Project was a drainage improvements project designed to improve the conveyance of stormwater through Smith Branch. The project is located on Winner’s Circle at the Smith Branch Crossing. The project included the removal of two existing 96-inch CMP culverts and the construction of a 40-foot pan girder bridge structure. In addition, the project included minor channel cleaning and regrading of the Smith Branch Channel in the immediate vicinity of the bridge location.

Construction Cost: $244,533