Project Description: This project was developed to provide pedestrian access in and around FM 1660 South and Farley Middle School   The project consisted of approximately 8,800 LF of 8′ wide sidewalk with associated pedestrian ramps, crosswalk, curb and gutter installation, asphalt, concrete driveway replacement and solar panel crossing and school zone speed signs. The sidewalk is located within City of Hutto and TxDOT roadway rights-of-way and required TxDOT coordination.

Scope of Services: KPA provided preliminary planning and design services as well as design and construction surveys, final design, bidding and construction administration

Construction Cost: $539,300