<< Back

Bowman Road Drainage Improvements | City of Round Rock

Round Rock, TX

Project Description: The project consisted of improvements for drainage conveyances within the vicinity of Bowman Road and the Onion Branch watershed located in the City of Round Rock, Texas.

The improvements included channel excavation, removal of existing concrete flumes and installation of HDPE storm sewer pipes, construction of pilot channels in existing drainage easements, replacement of existing culverts across Bowman Road and Greenwood Drive with reinforced concrete box culverts, traffic control, miscellaneous erosion control, etc.

Scop of Services: Preparation of Submittals, Surveying, Preliminary Design, Final Design and Contract Documents.

Construction Cost: $1,150,830.