
Construction on the $1.78 million, 1.5 mile trail began in early September of 2005. The project consisted of 1.5 miles of a 10’ concrete trail, 500’ of retaining walls, six pocket parks, two parking lots, seven box culvert crossings, a pedestrian bridge and a low water crossing of Nolan Creek.